[...]Passau, Germany Since 1 June 2006, the Passau wastewater treatment plant and HUBER SE have been linked by a continuous, trusting and successful service partnership. Over the course of two decades, numerous HUBER‑systems have been reliably serviced, maintained and technically upgraded – a milestone that impressively underlines the importance of professional manufacturer maintenance. The Passau wastewater treatment plant, designed for 110,000 population equivalents and operated by a dedicated team of ten staff members, has relied on HUBER‑technology for many years. The plant’s equipment includes[...]
[...]Vilshofen, Germany At the start of 2026, a comprehensive one-off plant maintenance was carried out on the HUBER machines at the Vilshofen sewage treatment works in Lower Bavaria. Designed for a population equivalent of 56,000, the plant is operated by Vilshofen Municipal Wastewater Services. During normal plant operation, one or two staff members are usually on site. Since 2007, the sewage treatment works has used two HUBER Rotary Drum Fine Screen ROTAMAT® Ro2 1000/5 units and one HUBER Coanda Grit Washer RoSF4/2. These are supplemented by two vortex washers from a third-party manufacturer. As part[...]
[...]Kabisbach, Germany With the launch of the modular HUBER Cold Air Dryer HPS® and the commissioning of the first reference unit at the Todtenweis wastewater treatment plant (of Kabisbachgruppe Wastewater Association), HUBER is presenting a forward-looking, energy-efficient solution for sludge drying. Designed for small to medium-sized sewage treatment plants with a capacity of up to 50,000 population equivalents (PE), the HUBER Cold Air Dryer HPS® expands the product portfolio of thermal sludge drying solutions. This innovative technology treats the sludge in a closed, modular unit. Each HUBER Cold[...]
[...]Kodersdorf, Germany Kodersdorf in Saxony lies on the River Weißer Schöps and is nestled in a picturesque landscape between the Königshain Mountains and the Upper Lusatian Lakeland, in the immediate vicinity of Görlitz. The sewage treatment plant is located in the industrial estate; its capacity was expanded from 4,500 p.e. to 7,500 p.e. in 2023. The plant operates using aerobic sludge stabilisation. As part of the capacity expansion, a new pre-treatment system was installed, comprising a HUBER Complete Plant ROTAMAT® Ro5 100 and a HUBER Rotary Drum Fine Screen ROTAMAT® Ro2 1000/3. A second sludge[...]